Saturday, November 14, 2026

Hwy 544 bridge to have night time lane closures starting July 21st

David Hucks

Add as a preferred source on Google Get more Myrtle Beach News in your Google results. Add us as a preferred source.

Columbia, S.C. (July 14, 2025) — Starting on July 21, the South Carolina Department of Transportation will implement temporary nighttime lane closures on SC Hwy 544 bridge over the Intracoastal Waterway in Horry County. The purpose of these closures is to enable crews to perform regular bridge inspections.

Important Updates on Hwy 544 Bridge Lane Closures

The closures will take place from July 21 to July 24 and will begin daily at 7 p.m. and will be picked up at 6 a.m. the following morning.

SCDOT asks that drivers slow down and pay attention when driving near the work zone.

A map of the Hwy Bridge area can be found below.

Hwy 544 Bridge
Highway 544 area affected

About SCDOT

SCDOT, the agency overseeing South Carolina’s highways and bridges, manages planning, design, construction, financing, and roadway safety. To support the state’s economy and population growth, SCDOT created a Strategic 10-Year Plan for enhancing highways and bridges. Visit scdot.org for additional information.

Last Updated on: